Stephen
User Information
Started on uShip:
|
5/5/2008
|
Total Matches:
|
|
Shipments Posted:
|
0
|
Net Match Rate:
|
n/a
|
Feedback Score:
|
0
|
Percent Positive:
|
0%
|
Total Positive:
|
0
|
Total Negative:
|
0
|
Excessive Cancellations:
|
|
Customer History
|
Positive:
|
0
|
0
|
0
|
0
|
|
Neutral:
|
0
|
0
|
0
|
0
|
|
Negative:
|
0
|
0
|
0
|
0
|
|
Total Matches:
|
1
|
0
|
0
|
0
|
|
Cancellations:
|
0
|
0
|
0
|
0
|
|
Shipments Posted:
|
0
|
0
|
0
|
0
|
|
Net Match Rate:
|
n/a
|
n/a
|
n/a
|
n/a
|
|
A scheduling conflict arose that could not be resolved
|
|
A scheduling conflict arose that could not be resolved Scheduling conflict due to the owner of the goods and the goods to be transported are located in two different locations and the owner of the goods is not flexible on a specific pick up date. This is not the fault of the tranport company, the winning bidder. This is the fault of the owner of the goods. Response from DURATRANS: Thanks for letting everyone know it was the seller that was not able to meet the pickup date, I hope all works out in the end.
|
This user does not have any active shipments.
This user does not have any past shipments.
* Profile information provided by member. Please verify all credentials.