Listing Information

Shipment Title: industrial glass machine on flat bed
Shipper: provialsa (2)
Date Listed: 7/8/2007 2:44 AM CST
Date Updated: 7/16/2007 11:18 AM CST
Expires: 8/17/2007 12:00 AM CST
Pricing: $2,400 Shipper will consider bids an any price
# of Bids: 6
Auction Goods: No

Shipment Pictures Previous Image

1 of 2

Next Image

Magnify Image

Origin, Destination & Route Information Select any Flag to report a uShip Rules violation

  • Route Information
  • Estimate: 2,461.00 miles
Timeframe InformationReport a Violation
Pickup: 7/16/2007 to 7/19/2007
Delivery: Flexible

Shipment Description Select any Flag to report a uShip Rules violation

Commercial Freight Listing Information
  • industrial glass machine on flat bed
  • Shipment Details: bevelloni glass beveler Max 60 in used condition, working order..
  • Packaging: glass beveler main body weights 10,500 lbs. but it is very stable... external conveyours, wheeled racks, guides and electrical panel will be palletized
  • Dimensions(s):17 ft long, 5 ft height, 5 ft wide
  • Total Weight:11600 lbs
  • Special Permit Required:No
Additional Information: the machine will be loaded an unloadead with forklifts on departure and destination Report a Violation

Questions for this shipment: 

Question: Are you shipping it as seperate detached items,or as one and if so is the weight pretty much distributed.There is one free hour at each end,beyond that detention pay kicks in @ $65/hour.is any of 45', 48',or a B train of 2 24footers flatbed Ok. (7/8/2007)
Response: the machine main body will be detached from the lateral conveyours and glass racks (see the photos), these 12 frame parts will be tied in pairs and can be distributed in the truck bed, there's also a 30"x12"x70" electrical power box and a 42"x17" steel tank with the machine. Is the first time I ship something this big, you decide what is the best way to move this kind of item, i'll appreciate your recomendation. thank you (7/8/2007)
Response: It all depends on when you're 100% ready to make the move and what is available within 1 hour drive away from your zipcode.53' flatbeds are not too common.45 and 48 are the most common.The load need to be distributed properly between the axles or the truck will be stopped at the nearest active scale waiting for a forklift to rearrange it,That in itself can be costly.You must know how it came in and got installed unless you're buying it from someone.Best to ask.B trains distribute the load but would one be in your neighborhood when you're 100% ready.the match you see in my feedback was a screen printing shop move and had big pieces like yours among other things.Took from 9am to 3pm to load and 4 hours to unload.you get one free at each end.Too early to work on it.This thursday and friday is best for a monday p-up if you think you're ready. (7/10/2007)
Response: the lenght of the machine is only 17 feet, 53 is veeery large, 25' will be ok (7/10/2007)
Response: A 24 footer becomes a HOTSHOT.Aiming to move it as an LTL on whatever is available near your zipcode on 7-16-07 at 0900 and deliver 07-20-07.Are you flexible on W/END P&Ds (7/12/2007)
Question: Will a 53' van work or do you need a flat bed (7/9/2007)
Response: I think that loading and unloading the machine will be difficult in a van (7/10/2007)
Question: Hello Can this be transported on a 25' flatbed gooseneck trailer. It could be tarped if need to keep dry. Thank you. vwhit (7/10/2007)
Response: Hi! I'm sure that it will work if the flat surface of the trailer is at least 17 feet long.. (7/10/2007)
Question: Do you still need this shiped I noticed you have been flaged (7/11/2007)
Response: I don't know how I got he flag, but I still need this freight service, please bid with confidence. (7/11/2007)
Question: Ill do half the load for $1800... (7/12/2007)
Response: Hi! thanks for the offer, but I have to move all the machine at once (7/12/2007)
Question: My truck won't make it up the first mountain with that much weight! Thanks for the response though! (7/12/2007)
Question: Hello I am working on something to take out with you glass mach. If I can I can take it out for your target price When will you be ready to ship? Thank vince w (7/14/2007)

Bids on this shipment:

BidBid DateService ProviderService TypeModeStatus / ReasonDetails
$2,300 7/16/2007 CEMENTWORKS (1210+ positive feedback) -not specified- ? -not specified- Declined / Accepted another bid View Details
$3,000 7/13/2007 L3enterprises (134100+ positive feedback) -not specified- ? -not specified- Accepted View Details
$2,500 7/16/2007 JPDemko (3225+ positive feedback)Bronze Power Provider -not specified- ? -not specified- Declined / Accepted another bid View Details
$3,600 7/12/2007 vincewhit (4) -not specified- ? -not specified- Declined / Price too high View Details
$3,736 7/12/2007 tntfreight (1) -not specified- ? -not specified- Declined / Price too high View Details
$6,442 7/9/2007 dahgasman (1410+ positive feedback) -not specified- ? -not specified- Declined / Price too high View Details
* All Bids are rounded up to the nearest dollar for display purposes