uShip - the online shipping marketplace

the online shipping marketplace

Listed in Category: Freight > Truckload, Flatbed

Freight Shipping Forum > Cresci soapstone

  • Watch this shipment
  • Email this shipment to a friend
  • Print this page

Listing Information

Shipment Title: Cresci soapstone
Shipper: Teresina (0)
Date Listed: 8/16/2006 6:39 PM CST
Date Updated: 8/29/2006 11:23 AM CST
Expires: 9/5/2006 6:39 PM CST
Pricing: Shipper will consider bids an any price
# of Bids: 3
Auction Goods: No

Shipment Pictures Previous Image

Next Image

Magnify Image

Origin, Destination & Route Information Select any Flag to report a uShip Rules violation

  • Route Information
  • Estimate: 727.00 miles
Timeframe InformationReport a Violation
Within 1-2 weeks from today

Shipment Description Select any Flag to report a uShip Rules violation

Commercial Freight Listing Information
  • Cresci soapstone
  • Shipment Details: 4 slabs of soapstone
  • Packaging: We would like to load them on an A-frame provided by the shipping company. We have a forklift to use to load the stone, and the receiving company will have a forklift to unload.
  • Dimensions(s):Each slab is roughly 117" x 68" x 1.5". Each slab will weigh around 1,250 lbs
  • Total Weight:5000 lbs
  • Preferred Truck or Trailer:Flatbed
  • Special Permit Required:No

Questions for this shipment: 

Question: Would you laod the A frame on my flatbed? Does this soapstone break easily? If it is strapped side to side is that sufficient and how will you secure the A frame to the trailer? Thanks. GZ TOP. (8/18/2006)
Response: Yes, we can load the slabs onto your trailer with our forklift. The soapstone does not break any easier than marble or granite slabs if properly loaded. Usually the A frames are nailed or screwed down to the bed of the truck, assuming that the flatbed has wood on the bed. If it is a metal bed truck, then the truckers usually use straps or chains to hold the frames to the truck. Thanks, Ben (8/19/2006)
Question: Thanks. Here is a bid for your consideration. GZ TOP. (8/19/2006)
Question: For planning purposes, when will a decision be made about which transporter you will use? Thanks. GZ TOP (8/21/2006)
Response: I should be able to make a decision by end of day tomorrow , 8/22. Thanks for your follow up. (8/21/2006)
Question: Thanks. GZ TOP. (8/21/2006)
Question: ?. GZ TOP. (8/23/2006)
Response: Sorry about not getting back to you. We are choosing to go with another shipper who has experience handling stone slabs. I appreciate your prompt response on all of our questions. Thanks (8/23/2006)
Question: Thank you for the comeback. If it falls through, let me know. GZ TOP. (8/23/2006)

Bids on this shipment:

BidBid DateService ProviderService TypeModeStatus / ReasonDetails
$862 8/24/2006 gztop (3525+ positive feedback)Bronze Power Provider -not specified- ? -not specified- Declined / Accepted another bid View Details
$850 8/19/2006 star2002 (6) -not specified- ? -not specified- Accepted View Details
$862 8/19/2006 gztop (3525+ positive feedback)Bronze Power Provider -not specified- ? -not specified- Declined / Accepted another bid View Details
* All Bids are rounded up to the nearest dollar for display purposes