shipping the online shipping marketplace

6 Pallets MUST PICK UP BEFORE NOON SATURDAY OCT 17

  • Watch this shipment
  • Email this shipment to a friend
  • Print this page

Listing Information

Shipment Title: 6 Pallets MUST PICK UP BEFORE NOON SATURDAY OCT 17
Customer: williamcalluthers (1)
Date Listed: 10/16/2009 10:36 PM CST
Date Updated: 10/17/2009 1:45 AM CST
Expires: 10/19/2009 10:36 PM CST
Pricing: Shipper will consider bids an any price
# of Bids: 4
Auction Goods: No

Shipment Pictures Previous Image

Next Image

Magnify Image

Origin, Destination & Distance Information Select any Flag to report a uShip Rules violation

  • Distance Information
  • Est. Distance: 392.00 miles
Timeframe Information
Pickup: On 10/17/2009
Delivery: Flexible

Shipment Description Select any Flag to report a uShip Rules violation

Freight Listing Information
Total number of items: 1
Total weight: 4800 lbs
Item 1
Number of units: 6
Packaging: Pallets (48'' x 40'')
Total item weight: 4800 lbs
Unit dimensions
Length: 4 ft 0 in 
Width: 3 ft 4 in 
Height: 4 ft 2 in 
Weight: 800 lbs
Freight Class: 77.5*
* Freight Class estimated based on density only (lb. per cubic in.), actual class may vary due to other factors.
Freight description: PLEASE ONLY QUOTE IF YOU CAN BE CONTACTED BY PHONE FROM 7:00 AM SATURDAY 17 OCT AND CAN PICK UP SATURDAY MORNING 17 OCT. 6 pallets all standard size or slightly smaller. All pallets are shrink wrapped. The pallets contain used industrial electronic equipment. 5 pallets weigh 200-500lb each. One pallet weighs 2000lb. This shipment must be picked up before store closes at noon Saturday 17th October or there will be no staff to operate the fork lift.
Additional Information: Driver will need to phone one of the contacts to meet him to unlock and operate the forklift. If picked up any later than 12:00 noon on Saturday October 17 the driver will have to operate the hand electric forklift by himself. After 12:00 noon on Saturday October 17 there will be no staff able to operate the hand electric forklift. Report a Violation

Questions for this shipment: 

Question: Good luck (10/16/2009)
Response: Thanks. A previously booked driver didn't show up today and is not answering calls. :-( (10/16/2009)
Response: Well best we could do is Monday, and we can provide lift gate service at pickup if needed. Please let me know if this can wait till Monday and if you need lift gate for pickup, our drivers do not handle other company forklifts. (10/16/2009)
Response: At the site we have a Clark electric lift forklift. But it is hand push. There is no loading dock. On Monday the would only be somebody to unlock the roller doors and the forklift. They are not strong enough to be much help with pushing the forklift around. If your driver can operate the forklift then i am it is a possibility. (10/16/2009)
Response: Sounds good, however as stated before our drivers cannot operate other peoples machinery we will have to rebid with lift gate services. (10/16/2009)
Response: Hi Afino. If there is anything else i can tell you please ask. Will (10/16/2009)
Response: I think we have all the information we need. If you like our offer we would be good to pickup for you Monday, pending the availablity of lift gate truck that day. (10/16/2009)
Response: Ok Afino. find out if you have that lift gate truck for sure and get back to me. Pity about all this i had a full size gas forklift there all day today to load the driver who didn't arrive. Now we only have the smaller electric forklift. :-( Will (10/16/2009)
Response: Ok, well heres the thing I wont be able to find out until Monday. And once I let you know and you accept our offer and we get all paperwork for you completed it may be to late in the day to schedule for same day pickup. So if you like you can accept our offer and we can schedule for Monday and if no lift gate trucks are available then it will be Tuesday. Know what Im saying ? (10/16/2009)
Response: Hey Afino. In that case we might as well wait until Saturday and see if any one else wants to pick it up, while i am in Mesa to load them. If that fails then i can still book you and your lift gate truck for Monday/Tuesday. Thanks Afino. Will (10/17/2009)
Response: No problem, that works. Thanks (10/17/2009)
Response: Ok thanks Afino (10/17/2009)
Question: We will place a bid if we can pickup Monday. This offer will be for without use of lift gate services. If lift gate is needed please let us know so we can rebid. Best, afino (10/16/2009)
Response: Afino There is only a hand push electric forklift and no loading dock. i do not know the type of sides on your truck. So i don't know if you would need a lift gate. But remember there is one 2000lb pallet so you might need the lift gate. Will (10/16/2009)
Response: No problem, we just rebid with lift gate services for pickup. (10/16/2009)
Response: OK (10/16/2009)
Question: i still have the truck there... (10/17/2009)
Response: The other driver didn't show up and is not answering the phone. :-( I had a large gas forklift there all day for loading. Now i only have a smaller electric forklift for loading. :-( I can be at the store with the manager in the morning to load your truck probably from 8:00am. What sort of truck? Will (10/17/2009)
Response: the landstar truck i found has a 53 ft airride van,will this unit work or i can chech on a flat or step deck,?William (10/17/2009)
Response: That's confusing you name is William and my name is William :-). I don't know the configuration of your 53' Van. If the driver has a hand pallet jack for moving the pallets around inside the van or a lift gate to get my electric lift hand push forklift up then that should be perfect. Remember 5 of the pallets are light (200-500lb) but one pallet is 2000lb. If i can give you any more information to help you bid please ask. Thank you William (10/17/2009)
Response: i think that if we load the biggest pallet last the other ones can be moved forward,but i have No trailers in mesa area with pallet jacks on them,William and William is great name lol (10/17/2009)
Response: Hey William, I do not have a loading dock at this site. So, for an enclosed van with no lift gate we have to push the pallets down the van. I will have guys to help load tomorrow morning. If your driver does not mind us pushing the pallets in then we are OK to go. In Carson where the truck will be unloaded we do have a loading dock and all the equipment. William (10/17/2009)
Response: I think we can get it done i submited the same bid i did this afternoon,thanks William (10/17/2009)
Response: Will the driver be able to pick up in the morning before noon? And will you be able to talk on the phone after i accept the bid? Will you phone contactable in the morning and from what time please? Thank you William (10/17/2009)
Response: yes,William to all of the questions i am still up working so you may call me tonite if you wish,thanks William (10/17/2009)
Response: Hey William. Earlier today there were 7 pallets. We gave a whole bunch of tools away to the neighbors :-) Now there are only 6 pallets, so the load is a bit smaller. Can you help with the price at all? Thanks William (10/17/2009)
Response: 650 best i can do uship fees are 90.00 of that so that about 550.00 ,thanks William (10/17/2009)
Response: Yes i see how high the Uship fees are! I was reading your bid. it says "Timeframe: Service Provider will pick up shipment on 10/16/2009." Will pick up shipment be OK for 10/17/2009 before noon? Thanks William (10/17/2009)
Response: sorry well pick it up sat the 17,thanks William (10/17/2009)

Bids on this shipment:

BidBid DateService ProviderService TypeModeStatus / ReasonDetails
$650
10/17/2009 specializedtransportlandstar (1410+ positive feedback)TerraPass Certified Provider LTL Transport Only ? Trucking Accepted View Details
$700
10/17/2009 specializedtransportlandstar (1410+ positive feedback)TerraPass Certified Provider Other ? Trucking Declined / Accepted another bid View Details
$399
10/17/2009 afino (139100+ positive feedback)Silver Power Provider Member is logged in now LTL Transport Only ? Trucking Declined / Accepted another bid View Details
$375
10/16/2009 afino (139100+ positive feedback)Silver Power Provider Member is logged in now LTL Transport Only ? Trucking Cancelled by service provider View Details
* Denotes that additional options are available
Any bid placed in a different currency has been converted for your convenience. We've also rounded up the decimal places for display purposes.